The facility relies mainly on three gas turbines, two of which have been active since 1992 and one since 2001. All of them are fuelled with natural gas and coupled to their respective power generators. The energy it produces enters the National Transmission Grid.
Environmental protection and safety
A continuous emission monitoring system is in place to ensure emissions are monitored at all times.
Main features
Via della Chimica, 16 - 30175 Venezia (VE)Thermoelectric
Cycle: combined cycle with 3 gas turbines (GT3, GT4, GT5) + 3 steam turbines (ST1, ST2, G1A) + 6 alternators + 3 heat-recovery steam generators (HRSG3, HRSG4, HRSG5)
Energy source: Natural gas