The facility consists of 17 triblade wind turbines expressing a unitary capacity of 2 MW, adding up to a total of 34 MW. The energy produced at Low Voltage (LV) by the generator of each wind turbine is transferred to the control panels and the transformer within the tower to be converted from LV to MV (30,000 V).
The electricity produced by each wind turbine is collected at MV by means of an underground cable network. An underground duct connects the MV/LV cabins, and then goes on to the Electrical Station in Morrone del Sannio, where the energy is transformed and enters the public grid at 150 kV voltage.
Main features
“Le Serre” e “Colle Maresca”, Comune di Lucito (CB)Wind power
The wind farm is located near the country road connecting Celano and Foggia. The surroundings are mountainous, with sparse low- and medium-sized trees, and very rounded mountain tops.