Established in 2012, Infrastrutture Trasporto Gas Spa (ITG) carries out gas transmission activities and it is 100% controlled by Edison Group.
ITG is one of the three national grid gas transmission operators in Italy and it manages the Cavarzere-Minerbio pipeline, a first class natural gas pipeline which enables to import around 8 billion cubic metres of gas a year through the Adriatic LNG terminal into the national grid. The gas import accounts for around 10% of total domestic imports and provides the Italian system with an alternative gas supply source.
ITG obtained its certification as Independent Transmission Operator in 2013. It is one of the founding members of ENTSOG, the European network of transmission system operators for gas.